Hurricane Panel Installation Guide
Set the panel aside and drill the holes.
Hurricane panel installation guide. Center the panel in place over the window. 3 4 weeks. Mark the hole locations from the panel directly onto the house. 10 14 days.
3 when anchors are installed in concrete masonry or masonry stucco you can use the same spacing if the anchors are vibration resistant and have a listed typical ultimate capacity usually what is. Panel tracks make assembly and installation faster and easier. Slip the upper end of the first shutter into the header. 1 this table is based on 140 mph design wind speeds a 45 ft average roof height and an open exposure.
Before you begin make sure the uv side usually identified by a label and protective plastic seal is on the outside. For either installation method panels can be overlapped by more than 1 rise but should always be overlapped at least 1 rise for the most effective installation. 2 3 weeks. They offer substantial protection at a lower cost of other storm protection products.
Now you re ready to drill the holes into the panels using a step bit. Special situations such as protruding windowsills overhangs etc may require minor adjustments to the above instructions. 2 fasteners are to be installed at opposing ends or opposing sides of the shutter panels. Now with both tracks in place you can install the hurricane shutters.
3 4 weeks. Panels are attached with anchors top and bottom or by tracks.